Grand Palm Phase 3B
January 11, 2017Project Description: Subdivision; Clearing & earthwork, Storm, Sewer & Water lines. Infrastructures, and Curb & Gutter. Owner: Resource Conservation of Sarasota, LLC ; Neal Properties
Project Description: Subdivision; Clearing & earthwork, Storm, Sewer & Water lines. Infrastructures, and Curb & Gutter. Owner: Resource Conservation of Sarasota, LLC ; Neal Properties
Project Description: Includes sanitary sewer collection system, water distribution system, drainage pipe & roadway construction for Unit 13 of Boca Royale residential subdivision. Located in Sarasota, FL. Owner: Resource Conservation of Sarasota, LLC
Project Description: Construction Site Work and all associated work to finish, consists of mass grading for 88 lots and completion of 48 lots. Project includes: clearing, earthwork, and road construction necessary to support the construction of the complete project. Located in Venice, FL. Project Owner: Neal Communities; Blackburn Creek Community Development District's Project Engineer: Kimley-Horn and Associates, Inc. Plans and Specifications
Parallel Force Main includes approx. 6,200 LF 12" PVC force main which will run paralleled to the existing 12" force main in order to support additional capacity flowing to the Waste Water Treatment Plant. The parallel force main will convey excess flows from Lift Station #19 to the Waste Water Treatment Plant allowing the lateral pump station to continue pumping to the existing 12" waste water force main. Owner: City of Crystal River (Citrus County, FL )
Project Description: includes but not limited to, roadway-related improvements including pavement milling and resurfacing, drainage improvements, installation of underdrains, concrete driveways, concrete sidewalks, concrete curb and gutter, MOT, earthwork and sodding. Project Owner: City of Tampa Plans and Specifications
Project Description: Water quality project involving a section of Wolf Branch Road between Heather Street and Britt Road/Niles Road. Improvement include the installation of FDOT shoulder gutter and curb and gutter to convey runoff to stormwater inlets set along the edge of the roadway. Associated stormwater piping will be installed to direct waters to one of two stormwater treatment ponds to be construction with the project. Includes the rehabilitation of two existing concrete box culverts and weir wall along with resurfacing of Wolf Branch Road.Project Owner: Lake County BOCCPlans and Specifications
Project Description: LS#2 sanitary sewer rehab project, phase 1 consists of the following: fill all the cracks & voids on the interior walls of the manhole & coast the entire riser to the bottom of the ring & cover with calcium aluminate grout for (3) manholes; prepare the surface, grout fill all cracks & voids with calcium aluminate orothe approved grout, seal leaks with hydraulic cement & coat the entire interior of the manhole with coal tar epoxy for (12) manholes; remove & replace the manhole fram & cover, adjust to proper grade, fill voids & coast any exposed surface area with calcium aluminate grout for (2) manholes; clean & install a CIPP point lining at (4) locations, open & replace the 12" gravity sanitary sewer pipe & manholes between MS10239 & MH2006 near the intersection of N. Adair Blvd & Edgewater Dr, Public ROW of Shady Lane Dr from Reading Dr. to Poinsettia Ave, Public ROW of N. Lake Adair blvd from N. Westmoreland Dr. to Edgewater Dr., Public ROW of Edgewater...
Project Description: Approximately 17, 530 LF of 16" and 30" Ductile Iron Pipe (DIP) water main, approx. 392 LF of 24" O.D. steel casing pipe, including wedge restraints and gaskets, ductile iron bends, sleeves and tees, gate valves, and boxes, butterfly valves, and boxes, air release/vacuum valve assemblies, roadway restoration, milling, paving, grading, signalization loops, restoration of driveways, curbs and sidewalks, sodding, landscaping with all associated work. Project Owner: City of Tampa, Florida Plans and Specifications
Project Description: Demo existing Waste Water Treatment Plant and haul off, furnish & install complete lift station. Beginning with installation of 40 LF of DIP coming out of the receiving manhole (not including manhole) and ending with the 90 degree bend outside of the valve box, Construction of the Lift Station does not include the water service or driveway. Owner: Citrus County BOCCGeneral Contractor: TB Landmark, Inc.
Project Description: Replace 12" and 16" water main with 6,871 LF of 24" water main and 290 LF of 6", 8" and 16" water mainProject Owner: Orange County BOCC
Project Description: Site development: Includes earthwork, utilities, paving, & curb work Project Owner: Sarasota Associates A-1, B-II, C-III, D-IV, & E-5, LLCGeneral Contractor: Benderson Development Company, LLC Plans and Specifications
Project Description: Construct & widen North Hancock Road to a four-lane urban design roadway with curb & gutter, bike lane, sidewalks, and multi-use trail. Associated work includes: storm pipe & structure installation, retention pond, excavation, swale & ditch construction, gravity wall installation, guardrail installation, traffic signal installation/relocation, thermoplastic striping, sodding and other misc. construction. Project Owner: Lake County
Orange County, Florida - Contract Amount: $ 737,633.86
Project Description: Reconstruction of existing roadway intersection, new 16" water main for future connection and new 16" force main construction, abandon existing force main. Owner: Osceola County BOCCAwarded Contract Amount: $4,310,909.25
BOCC Orange County, Florida – Contract Amount: $3,117,496.75
City of Temple Terrace, Florida – 56th Street Corridor Improvements – Contract Amount: $3,431,300.00
BOCC of Pasco County, Florida – Community Development Project – Contract Amount: $4,490,717.75