Pospiech Contracting Inc.'s Projects

Grand Palm 2A(B) CDD Portion & Private Portion

October 11, 2016 Grand Palm 2A(B) CDD Portion & Private Portion

​Project Description: Construction Site Work and all associated work to finish, consists of mass grading for 88 lots and completion of 48 lots. Project includes: clearing, earthwork, and road construction necessary to support the construction of the complete project.  Located in Venice, FL. Project Owner: Neal Communities; Blackburn Creek Community Development District's Project Engineer: Kimley-Horn and Associates, Inc. Plans and Specifications 

Parallel Force Main

August 2, 2016

​Parallel Force Main includes approx. 6,200 LF 12" PVC force main which will run paralleled to the existing 12"  force main in order to support additional capacity flowing to the Waste Water Treatment Plant. The parallel force main will convey excess flows from Lift Station #19 to the Waste Water Treatment Plant allowing the lateral pump station to continue pumping to the existing 12" waste water force main. Owner: City of Crystal River (Citrus County, FL ) 

Wolf Branch Sink Drainage Improvements

March 29, 2016 Wolf Branch Sink Drainage Improvements

​Project Description: Water quality project involving a section of Wolf Branch Road between Heather Street and Britt Road/Niles Road.  Improvement include the installation of FDOT shoulder gutter and curb and gutter to convey runoff to stormwater inlets set along the edge of the roadway.  Associated stormwater piping will be installed to direct waters to one of two stormwater treatment ponds to be construction with the project.  Includes the rehabilitation of two existing concrete box culverts and weir wall along with resurfacing of Wolf Branch Road.Project Owner: Lake County BOCCPlans and Specifications 

College Park Sanitary Collection System Improvements

March 29, 2016

​Project Description: LS#2 sanitary sewer rehab project, phase 1 consists of the following: fill all the cracks & voids on the interior walls of the manhole & coast the entire riser to the bottom of the ring & cover with calcium aluminate grout for (3) manholes; prepare the surface, grout fill all cracks & voids with calcium aluminate orothe approved grout, seal leaks with hydraulic cement & coat the entire interior of the manhole with coal tar epoxy for (12) manholes; remove & replace the manhole fram & cover, adjust to proper grade, fill voids & coast any exposed surface area with calcium aluminate grout for (2) manholes; clean & install a CIPP point lining at (4) locations, open & replace the 12" gravity sanitary sewer pipe & manholes between MS10239 & MH2006 near the intersection of N. Adair Blvd & Edgewater Dr, Public ROW of Shady Lane Dr from Reading Dr. to Poinsettia Ave, Public ROW of N. Lake Adair blvd from N. Westmoreland Dr. to Edgewater Dr., Public ROW of Edgewater...

Blue Sink Water Main

March 29, 2016 Blue Sink Water Main

Project Description: Approximately 17, 530 LF of 16" and 30" Ductile Iron Pipe (DIP) water main, approx. 392 LF of 24" O.D. steel casing pipe, including wedge restraints and gaskets, ductile iron bends, sleeves and tees, gate valves, and boxes, butterfly valves, and boxes, air release/vacuum valve assemblies, roadway restoration, milling, paving, grading, signalization loops, restoration of driveways, curbs and sidewalks, sodding, landscaping with all associated work. Project Owner: City of Tampa, Florida Plans and Specifications 

North Hancock Road Extension Phases IIIA & IIIB

March 24, 2016 North Hancock Road Extension Phases IIIA & IIIB

Project Description: Construct & widen North Hancock Road to a four-lane urban design roadway with curb & gutter, bike lane, sidewalks, and multi-use trail. Associated work includes: storm pipe & structure installation, retention pond, excavation, swale & ditch construction, gravity wall installation, guardrail installation, traffic signal installation/relocation, thermoplastic striping, sodding and other misc. construction. Project Owner: Lake County