Parallel Force Main

Posted at 4:49 pm on 08/02/2016
​Parallel Force Main includes approx. 6,200 LF 12" PVC force main which will run paralleled to the existing 12"  force main in order to support additional capacity flowing to the Waste Water Treatment Plant. The parallel force main will convey excess flows from Lift Station #19 to the Waste Water Treatment Plant allowing the lateral pump station to continue pumping to the existing 12" waste water force main. 

Owner: City of Crystal River (Citrus County, FL ) 

Total Views: 4649