Citrus Grove Rd. Phase I from Grassy Lake Road to North Hancock Rd.
Project Location:  Minneola, FL 32804

Owner: Lake County BOCC

Project Description: Consists of constructing a new 4-lane highway extending from existing Citrus Grove Rd. to newly constructed North Hancock Rd. Other work associated with this project includes the following: storm pipe and structure installation, curb and gutter, concrete sidewalks, 12' asphalt multi-use trail, retention pond excavation, milling, paving, sod, and other misc. incidental construction. 

Also, as part of this project, Lake County is pairing with the City of Minneola for relocation of the City's utilities. This will be an alternate bid . 


For further questions on this project, please contact 

Miriam Cedeno, Estimator 

352-726-3940 EXT 202

MCedeno@pospiechcontracting.com 







Pospiech's Bid No. 18-001
Quotes are Due:  TUESDAY, APRIL 24TH , 2018; To Allow the Estimator Time for Review

John Young Parkway Reclaimed Water Main Improvements 
Project Location: John Young Parkway, Orlando FL 32804

Owner: Orange County 
Project Description: The project includes construction of water main improvements along John Young Parkway from just north of Town Center Blvd. to the North side of the State Road 528 Interchange. 





For further questions on this project, please contact 

Miriam Cedeno, Estimator 

352-726-3940 EXT 202

MCedeno@pospiechcontracting.com 









UNDER EVALUATION
(Waiting for Notice of Award)











Pospiech's Bid No. 18-014
(Second Low Bidder) 
Bid Date 4.10.18

Summerlake Park Force Main & Tiny Road Reclaimed Main
Project Location: Summerlake Park Blvd. Winter Garden, FL 34787

Owner: Orange County 

Project Description: Scope include the upsize of existing 16" force main on Summerlake Park Blvd. to 24" and upsize 12" reclaimed line on Tiny Road to 24". Work also includes paving in order to restore the roadway surface.  






Pospiech's Bid No. 18-010  
(Second Low Bidder) 
Bid Date: 4.3.18 

Force Main 12A Replacement 
Project Location: MANATEE COUNTY, BRADENTON, FL 

Owner: Manatee County 
Project Description: Provide Force Main 12A Replacement, as specified in this invitation to bid to include construction of approx. 10,300 LF of force main by directional drilling and trenching. 





Pospiech's Bid No. 18-007

ARIA
Project Location: This project is located between Laurel Rd. and Border Rd., West of Jacaranda Blvd. Extension in Venice, FL 

Owner: Neal Communities of Southwest Florida, LLC
Project Description: Site work and Utilities (182 Home Sites and Amenity)







Pospiech's Bid No. 18-004
(Second Low Bidder) 

US 19 Reclaimed Water Transmission System Phase I 
Project Location: US 19 and HWY 50 

Owner: Hernando County 
Project Description: Install approx. 40,000 LF of reclaimed water main to include direct bury, directional drill, install above and below grade air release valve assemblies, construction of three (3) million gallon pre-stressed concrete ground storage tank, vibro-replacement soil stabilization, install and coat above ground piping, remove and grout existing buried forcemain, remove and replace existing FDOT sidewalk and mitered end section, milling, paving, pavement marking, maintenance of vehicular and predestruan traffic, install electrical equipment, install and integrate SCADA and Gopher Tortoise survey and relocation. 




Pospiech Contracting, Inc. encourages minority and small business bids. All bidders will be afforded full opportunity to submit quotes in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, or national origin in consideration for award. To be a part of our bid opportunity email list for notifications, please email Vikki Harris, Bid Coordinator,  at vharris@pospiechcontracting.com or call 352-423-4957.